Construction Capital
8 min readUpdated February 2026

Monitoring Surveyor Fees Explained: The Cost Most Developers Underestimate

Monitoring surveyor fees are one of the most underestimated costs in development finance. This guide breaks down what you will pay, why costs escalate, and how to keep them under control.

What is a monitoring surveyor and why do lenders require one?

A monitoring surveyor is an independent, RICS-qualified professional appointed by the lender to oversee the physical progress of your construction project. Their role is to verify that the works are being carried out in accordance with the approved plans and specifications, that the build quality meets acceptable standards, and that costs are in line with the approved budget. The monitoring surveyor acts as the lender's eyes and ears on site, providing the assurance required before each tranche of development finance is released.

Every development finance lender in the UK requires a monitoring surveyor, and the cost falls entirely on the borrower. This is not optional, nor is it negotiable in principle, although the frequency of visits and the firm appointed can sometimes be influenced. The monitoring surveyor is distinct from your own project manager or quantity surveyor. They serve the lender's interests, and their reports determine when, and how much, of your facility is drawn down.

In our experience, many first-time developers significantly underestimate the total cost of monitoring surveyor fees over the life of a project. A scheme that requires ten site visits at £850 per visit will generate £8,500 in monitoring costs alone, and that figure can climb rapidly if additional visits are required due to delays, changes in specification, or concerns raised during routine inspections. We always advise developers to treat monitoring costs as a material line item in the development appraisal rather than a minor incidental expense.

Typical monitoring surveyor fee structures

Monitoring surveyor fees in the UK generally fall into two structures: a fixed fee per visit or a fee based on a percentage of the total build cost. The per-visit model is the most common. Fees typically range from £500 to £1,500 per inspection, depending on the size and complexity of the scheme. A straightforward residential development of four to six units might attract fees at the lower end, around £600 to £800 per visit. A larger or more complex scheme, such as a 30-unit apartment block or a mixed-use development, will command fees of £1,000 to £1,500 or more.

The percentage-based model is less common but is used by some lenders, particularly on larger schemes. Under this structure, the monitoring surveyor charges a fee equivalent to 1% to 1.5% of the total build cost for the entirety of their engagement. On a scheme with build costs of £1,200,000, that equates to £12,000 to £18,000. Whether this is more or less expensive than the per-visit model depends on the number of inspections required. For a project requiring 12 visits at £1,000 each, the per-visit cost of £12,000 would be comparable to the lower end of the percentage model.

Some monitoring surveyors also charge a setup fee, sometimes called a desk-top review fee, for their initial assessment of the project documentation before the first site visit. This typically ranges from £750 to £2,000 and covers their review of the planning documents, quantity surveyor cost plan, contractor details, and build programme. This setup fee is often overlooked when developers are comparing finance offers, but it adds to the total monitoring cost.

How many visits should you expect?

The number of monitoring surveyor visits depends on the duration and complexity of your project. As a general rule, expect one visit per month during the active construction phase. A 12-month build programme will therefore require approximately 12 visits, plus the initial desk-top review and potentially a final completion inspection. For a 15-month programme, budget for 15 to 17 visits in total.

However, visits can increase beyond the standard monthly schedule in several circumstances. If the monitoring surveyor identifies quality issues or cost overruns, they may recommend additional inspections to protect the lender's position. If you request an unscheduled drawdown between regular visits, most lenders will require an additional inspection before releasing funds, which triggers another fee. Programme delays that extend the build beyond the original loan term will naturally require additional visits during the extension period.

We have seen projects where the original budget included ten monitoring visits but the actual number reached 18 due to a combination of delays, additional drawdown requests, and remedial works. The extra eight visits at £900 each added £7,200 to the project cost, a sum that had not been accounted for in the development appraisal. This is why we advise building a buffer of at least 20% above the estimated monitoring costs into your appraisal, as explained in our guide on how development finance works.

Can you influence which surveyor is appointed?

In most cases, the lender appoints the monitoring surveyor from their approved panel, and you have limited say in the selection. However, some lenders will allow borrowers to choose from a shortlist of two or three approved firms, which gives you some ability to compare fees and reputation. If you have worked with a monitoring surveyor on a previous project and found them thorough but fair, it is worth asking your lender or broker whether that firm is on the lender's panel.

The key thing to understand is that the monitoring surveyor works for the lender, not for you. Their primary obligation is to protect the lender's investment, which means they can be conservative in their assessments. This occasionally creates tension, particularly when a surveyor values completed works at less than the developer believes they are worth, resulting in a smaller drawdown than expected. In our experience, maintaining a professional and transparent relationship with the monitoring surveyor is the best way to avoid disputes. Provide them with comprehensive documentation, give advance notice of visits, and have your site manager available to answer questions.

If you believe a monitoring surveyor is being unreasonable or is significantly undervaluing completed works, raise it with your broker first. We can often mediate between the borrower and the lender to reach a fair outcome. In rare cases where the relationship has broken down, it may be possible to request a change of surveyor, although this is at the lender's discretion and is not guaranteed. The most effective strategy is to maintain clear records, photograph progress extensively, and ensure your contractor provides detailed valuations that the monitoring surveyor can verify.

Monitoring surveyor fees across different regions

Monitoring surveyor fees can vary by region, reflecting differences in travel costs and the availability of qualified professionals. In Greater London and the South East, fees tend to be at the higher end of the range because of the concentration of complex, high-value schemes. Expect to pay £800 to £1,500 per visit for projects in London, Surrey, and Kent. In the Midlands and the North of England, fees are typically lower, ranging from £500 to £1,000 per visit, reflecting both lower property values and reduced travel time for regionally based surveyors.

For projects in more remote locations, such as parts of Devon, Somerset, or rural Wales, monitoring surveyors may add a travel supplement of £150 to £300 per visit. This is because few RICS-qualified monitoring surveyors are based in these areas, meaning the surveyor must travel a considerable distance. We have seen developers in Devon face total monitoring costs that were 30% higher than equivalent schemes in Bristol, purely due to the travel component.

If you are developing across multiple sites in the same region, it may be possible to negotiate a discounted per-visit rate with the monitoring surveyor. Some firms offer portfolio pricing where they inspect two or three sites in the same area on the same day, reducing the effective per-visit cost. This is particularly relevant for developers with multiple projects in areas such as Essex, Hertfordshire, and Berkshire. Contact us through our deal room to discuss how we can help optimise your monitoring costs across multiple facilities.

Budgeting for monitoring fees in your development appraisal

Accurate budgeting for monitoring surveyor fees requires you to estimate both the number of visits and the cost per visit. Start with your build programme: if the construction phase is 14 months, assume 14 monthly visits plus an initial desk-top review and a final completion inspection, giving 16 touchpoints. Multiply by the expected per-visit cost, add the setup fee, and include a 20% buffer for unscheduled visits.

For example, on a £1,800,000 build cost residential scheme in Greater Manchester with a 14-month programme, a reasonable monitoring surveyor budget would be: desk-top review £1,200 plus 16 visits at £750 each (£12,000) plus 20% contingency (£2,640), giving a total budget of £15,840. This figure should be included as a separate line item in your development appraisal alongside other finance costs such as arrangement fees and interest.

Do not assume that monitoring costs are included in the overall finance package. They are always an additional cost borne by the borrower. Some lenders will add the monitoring surveyor fees to the facility and roll them up with interest, meaning you pay interest on the monitoring costs. Others require the fees to be paid directly by the developer as invoices are received. Clarify this at the term sheet stage so you can model the cash flow impact accurately. If monitoring fees are rolled into the facility, remember that you are paying interest on them, which increases the true cost further.

Ready to Apply?