Property development finance

Conversion Development Finance

Senior debt for turning barns, chapels, pubs, mills and listed buildings into homes. Lenders price the existing fabric as the risk, so the survey, consents and contingency decide your terms as much as the end values do.

Senior debt
Typically up to 65-70% LTGDV
Loan to cost
Typically capped at 80-85%
Contingency lenders expect
Usually 10-15% of build cost
Builder's VAT on qualifying conversions
5% reduced rate

How does conversion finance work?

  • Purchase: an initial advance against the building, with your equity in first
  • Works: staged drawdowns released against monitoring surveyor sign-off
  • Completion: interest rolls up until the units are sold or let
  • Exit: sales proceeds or a refinance repay the facility in full

Development facility or heavy refurbishment loan?

  • Change of use with new units created: development facility
  • Structural works, new floors, mezzanines or extensions: development facility
  • Existing dwelling, internal reconfiguration, no planning needed: heavy refurb
  • Cosmetic works and re-letting: light refurb or bridging

Building-type risks lenders price in

VAT on a conversion: get it right before the build contract

Listed buildings: consent first, then funding

Exit routes: sell, or refinance and hold

  • Sell the converted homes on the open market
  • Refinance completed homes onto buy-to-let mortgages and hold them
  • Refinance a mixed-use or single-let building onto a commercial mortgage
  • Use development exit finance to cover slow sales or lettings

Lending criteria

What development finance lenders check.

  1. 01

    Structural survey from a chartered engineer

    Lenders want to know the frame, walls and foundations can take new floors, roof loads and insulation. A desktop report rarely satisfies them on a barn or mill. Opening-up works before you apply for funding are money well spent.

  2. 02

    Every consent, with its conditions

    Planning, listed building consent where relevant, and building regulations strategy. The lender's solicitor will want discharged pre-commencement conditions before the first build drawdown.

  3. 03

    A contingency that reflects the building

    A 5% contingency on a 19th-century chapel will be challenged. Most lenders expect 10-15% on conversions and will haircut your appraisal if you don't show it.

  4. 04

    Contractor with conversion experience

    Heritage and structural work needs a contractor who has done it before. Lenders look at comparable projects, the fixed-price element of the contract and how provisional sums are treated.

  5. 05

    Comparables for converted stock

    Converted property trades differently from new-builds. The valuer will want evidence from comparable conversions nearby, not new-build estate values, and will adjust for awkward layouts, parking and outlook.

Development loan calculator

Run the numbers on a typical scheme.

Illustrative scheme: converting a redundant stone barn range into four homes with full planning, using a 12.5% contingency to reflect the existing structure. Change any input to model your own. Interest assumes the full facility is drawn for the whole term, a conservative ceiling.

How to apply

How to apply for Conversion Development Finance.

Most property development loans reach first drawdown 4 to 8 weeks after application, covering valuation, legal due diligence and credit approval. As brokers we run the process with you from first enquiry to the first drawdown.

  1. 01

    Submit Your Deal

    Enter your project details in our Deal Room. We typically review within 24 hours and provide an initial assessment.

  2. 02

    Lender Matching

    We match your project to the most suitable development finance lenders from our 100+ panel and present indicative terms from multiple sources.

  3. 03

    Application & Valuation

    Full application submission with supporting documents. The lender instructs a RICS valuation and appoints a monitoring surveyor.

  4. 04

    Drawdown & Build

    Funds are released in stages as construction progresses, verified by the monitoring surveyor at each milestone.

Avoid

Where these deals go wrong.

  • Pricing the building before the survey

    Buyers agree a price on the GDV and discover the timber frame needs replacing. Once the structural report lands, the lender sizes the loan on the real cost, and the equity gap is yours to fund.

  • Assuming the 5% VAT rate applies automatically

    If the contractor charges 20% because nobody evidenced the qualifying conversion, or the scheme is listed-building alteration work, your costs rise by a margin the facility wasn't sized for.

  • Starting works ahead of consent conditions

    Stripping out a listed interior before conditions are discharged can stop the scheme, trigger enforcement and freeze your drawdowns. Get written sign-off first, every time.

Common questions

Conversion Development Finance FAQs.

How much can I borrow with conversion finance?
Senior lenders typically advance up to 65-70% of the gross development value, with total borrowing capped at around 80-85% of costs. On an older or listed building the loan is often lower, because the lender's surveyor builds a larger contingency into the appraisal. Mezzanine funding can sit behind the senior loan where the first-charge lender allows it, reducing the cash you put in.
Can I get conversion finance without planning permission?
Not usually for the works. Development lenders want full planning permission, or prior approval under permitted development rights, before they release build funds. Many developers buy the building with a bridging loan while the application runs, then refinance into a development facility once consent is granted. Factor the bridging cost and the risk of refusal into what you pay for the property.
Why use a broker for conversion finance?
Conversion finance products vary more than new-build lending. Some lenders won't take listed buildings, others limit loan size on churches or rural barns, and appetite changes through the year. Brokers who place these deals regularly know which lenders suit which building, and can present a complex scheme with the survey, consents and cost plan a credit team expects. That usually means a firmer quote, sooner.
Can I get development finance for a barn conversion?
Yes. Barn conversions with full planning or Class Q prior approval are regularly funded as development. Lenders want a structural survey confirming the building can be converted rather than rebuilt, clear access and services, and comparable sales of converted barns nearby. Leverage is typically up to 65-70% of GDV, subject to a loan-to-cost cap, with build costs released in stages.
What VAT rate applies to converting a building into flats?
Where a non-residential building is converted into dwellings, or the number of dwellings in a building changes, your builder's services and the materials they incorporate can be charged at the 5% reduced rate. Professional fees remain at 20%. If you convert a non-residential building and then sell the freehold or a long lease, that first sale can be zero-rated, which allows you to reclaim VAT.
Do lenders fund church and chapel conversions?
Yes, though fewer lenders are comfortable with them. Expect questions about burial grounds and covenants on the title, the cost of subdividing a tall single volume, parking and the sales evidence for unusual layouts. A clean title report and a cost plan from a surveyor who has priced similar buildings make a material difference to the terms you're offered.
Is a listed building conversion harder to finance?
It narrows the lender panel and lengthens due diligence, but it's fundable. You'll need listed building consent alongside planning, discharged conditions before drawdown, a contractor with heritage experience and a realistic contingency. Approved alterations to listed buildings are standard-rated for VAT, so build that 20% into the appraisal rather than assuming a reduced rate.
How much contingency do lenders want on a conversion?
Usually 10-15% of build cost, and sometimes more on older or listed buildings. The figure depends on how much of the structure has been opened up and inspected. A survey that has already exposed the roof timbers and foundations can justify a lower contingency than one based on a visual inspection only.
Should I use refurbishment finance or development finance for a conversion?
If the building is changing use, new units are being created or the works are structural, most lenders will treat it as development, sized on GDV with staged drawdowns. Heavy refurbishment finance can suit a building that is already residential where the works are internal and well costed. The wrong product can leave you short of funds partway through the build.
Can I finance a pub conversion to residential?
Yes, once you hold full planning. Pubs have been sui generis since 2020, so change of use needs an application, and many local plans resist the loss of pubs. Check whether the pub is listed as an Asset of Community Value, as a community bid window can delay your purchase. Lenders will also look at how the trade areas and the existing flat are treated.

Further reading

Guides and tools.

Start a deal

Terms for your scheme
inside a day.

Two minutes on a call or form. We come back with indicative terms from the right lenders inside one working day — no commitment, no hard credit search.