ccConstruction Capital

Independent London brokerage. 25+ years of property-finance experience, distilled into one principal.

+44 20 3816 3693matt.lenzie@construction-capital.co.uk

London, United Kingdom

Services

  • Development Finance
  • Mezzanine Finance
  • Bridging Loans
  • Equity & JV
  • Refurbishment
  • Commercial Mortgages
  • Development Exit

The firm

  • About Matt Lenzie
  • Case Studies
  • Lender Panel
  • Introducers
  • Contact
  • Start a deal

Resources

  • Market Reports
  • Guides
  • Calculators
  • Glossary
  • FAQ

Topic guides

  • Development Finance Guide
  • Bridging Finance Guide
  • Mezzanine Finance Guide
  • Development Costs
  • First-Time Developers
  • Permitted Development
  • Development vs Bridging
  • Mezzanine vs Equity JV
  • Development vs Commercial
  • Broker vs Direct to Lender

Nationwide coverage

All locations

London & South East

  • London
  • Kent
  • Surrey
  • Sussex
  • Hampshire
  • Berkshire
  • Hertfordshire
  • Essex

South West

  • Bristol
  • Somerset
  • Devon
  • Cornwall
  • Dorset
  • Gloucestershire

Midlands

  • Birmingham
  • Warwickshire
  • Staffordshire
  • Nottingham
  • Leicester
  • Lincolnshire

North

  • Manchester
  • Leeds
  • Liverpool
  • Lancashire
  • Newcastle
  • York

Scotland & Wales

  • Edinburgh
  • Glasgow
  • Cardiff
  • Swansea

Construction Capital is an independent commercial finance brokerage arranging funding for UK property developers and investors. Property development finance, commercial bridging and other business-purpose lending are not regulated activities under FSMA 2000 and are not regulated by the Financial Conduct Authority.

Where a product is a regulated activity — for example, bridging secured on a borrower’s main residence — we arrange it through lenders who hold the relevant FCA permissions. We are not an FCA-authorised firm. Every offer is subject to the lender’s underwriting, valuation and legal due diligence.

Construction Capital is a trading name of Lenzie Consulting Ltd, a company registered in England & Wales under company number 08174104. Registered office: Lynch Farm, The Lynch, Kensworth, Dunstable, Bedfordshire LU6 3QZ.

© 2026 Construction Capital. All rights reserved.

PrivacyTermsContact
ccConstruction Capital
LocationsCase Studies
AboutIntroducersContact
+44 20 3816 3693Start a deal
  1. Home/
  2. Locations/
  3. Nottinghamshire/
  4. Worksop/
  5. Development Exit Finance

Worksop, Nottinghamshire

Development Exit Finance
in Worksop

Development exit finance replaces your development facility once construction is complete, giving you breathing room to sell units at the best price rather than under pressure. It repays the senior lender and provides a lower-cost holding facility while you market and sell.

Get development exit finance termsOr call +44 20 3816 3693
Nottingham waterfront building reflections

Worksop, Nottinghamshire

Development Exit Finance
in Worksop.

For completed developments in Worksop, where the median sale price is £190,000, exit finance can significantly reduce your holding costs while units sell. With a stable local market, exit lenders view Worksop schemes favourably, typically offering terms that save 2-4% per annum versus rolling over the original development facility.

Choosing between extending your existing development facility and refinancing onto a dedicated exit product depends on the numbers. Many development lenders offer extension terms - but these are often at increased rates (1-2% premium) and with additional fees. A standalone exit facility from a specialist lender frequently works out cheaper, even accounting for the arrangement fee and legal costs of a new facility.

Exit finance is particularly valuable for developers who have multiple projects in the pipeline. Repaying your development lender frees up your borrowing capacity and track record for the next scheme, rather than having capital tied up in a completed but unsold project. This capital recycling effect can be worth more than the direct interest saving.

The exit finance market includes specialist bridging lenders, challenger banks, and some mainstream funders who have developed specific exit products. Each has different criteria around minimum units remaining, acceptable sales periods, and geographic focus. Matching your completed scheme to the right exit lender is as important as finding the right development funder in the first place.

The region's stock of Victorian terraces, former hosiery and lace works, and redundant agricultural buildings creates a natural pipeline of conversion and refurbishment opportunities, while Lincolnshire's market towns offer accessible land values with genuine local housing undersupply. Lenders familiar with the East Midlands recognise the strong income potential relative to entry costs.

Development exit finance is one of the most cost-effective decisions a developer can make once construction is complete. For Worksop schemes where the build is finished but sales are ongoing, replacing an expired development facility with a dedicated exit product typically saves 2-4% per annum in interest costs. This saving compounds quickly on larger outstanding balances, and the removal of monitoring surveyor fees and non-utilisation charges provides additional relief.

We arrange exit finance for completed developments across Nottinghamshire, coordinating the transition from development lender to exit provider to ensure there is no gap in funding. The process involves a Red Book valuation of the completed units, legal transfer of the security, and agreement of a repayment schedule that reflects your projected sales timeline. With established relationships across the exit finance market, we typically secure terms within 2-3 weeks of initial enquiry.

Why Choose a Development Exit Finance Broker in Worksop?

Development exit finance replaces your expensive development loan with a lower-cost facility once construction is complete. This specialist product is designed for one specific scenario: the build is finished, but not all units have sold. Your development lender wants repayment, and you need time to sell at the best achievable prices rather than accepting fire-sale offers. For a completed Worksop scheme where the median unit value is £190,000, exit finance can save thousands in monthly interest costs versus extending an expired development facility.

The exit finance market is served by specialist bridging lenders, challenger banks, and dedicated exit funds, each with different criteria around minimum remaining units, acceptable sales periods, and geographic coverage. As brokers who arrange exit finance regularly across Nottinghamshire, we know which lenders offer the fastest completion, most competitive rates, and most flexible repayment structures for your specific situation.

Timing the transition from development finance to exit finance is critical. Start conversations with exit lenders 2-3 months before practical completion so the new facility is ready to draw as soon as the build is signed off. Submit your project to begin the process.

The live Bassetlaw District Council planning register currently shows 133 residential applications awaiting decision in Worksop, together proposing 334 units. The largest — at School Land And Access Kingston Road Worksop Nottinghamshire — proposes 95 units. That pipeline is a useful gauge of both local competition and lender familiarity with Worksop schemes.

On a completed Worksop scheme of six median-priced units (~£1.1M of stock), an exit facility at 70% LTV releases around £798,000 — clearing the development lender and cutting the funding cost while sales complete at full market pace.

Types of Exit Finance We Arrange in Nottinghamshire

We source exit facilities for the full range of completed developments across Nottinghamshire: residential apartment schemes with multiple unsold units, housing developments where sales have been slower than projected, mixed-use buildings with completed commercial and residential elements, and student accommodation or build-to-rent schemes transitioning from development to investment hold.

Exit finance can also serve as a bridge to long-term refinancing. If you plan to retain completed units as investments rather than selling, exit finance provides a low-cost holding facility while you arrange a commercial mortgage or buy-to-let mortgage portfolio. This is particularly relevant in Worksop where strong rental yields may make retaining units more attractive than selling in a slower market.

For schemes with planning for additional phases, exit finance on the completed phase can also free up your development finance facility for the next build stage. This capital recycling approach allows you to maintain construction momentum without needing to wait for all sales on the current phase before starting the next.

The development exit market serving Worksop includes dedicated products from Together, LendInvest, Aldermore, Paragon, Shawbrook, and Assetz Capital. Structurally it is a bridging loan against completed stock: cheaper than the development facility it repays, released at practical completion, and flexible on partial repayments as units sell. Where the plan is to hold rather than sell, buy to let term debt or a second charge against retained units can replace the exit bridge. Related routes from the same funders include commercial bridging for mixed-use stock, auction finance where completed units are being sold at auction, and standard bridging finance where only a short extension is needed.

Development Exit Finance Rates and Costs in Worksop

Exit finance rates for completed Worksop schemes typically range from 0.55% to 0.85% per month (6.6-10.2% per annum), compared to the 8-12%+ per annum you may be paying on an expired or extended development finance facility. The saving of 2-4% per annum on the outstanding balance, combined with the removal of monitoring surveyor fees and non-utilisation charges, makes exit finance significantly cheaper than rolling over development debt.

Arrangement fees are typically 1-2% of the facility, with standard valuation and legal costs. The facility is structured as a single drawdown that repays your development lender in full. As units sell, partial repayments reduce the outstanding balance and your interest costs. Most exit lenders require each unit sale to repay 100-110% of the per-unit debt allocation, ensuring the LTV improves progressively.

The total saving depends on the number of unsold units, the expected sales period, and the difference between your current development finance rate and the exit rate. We model this comparison for every enquiry, showing you the projected saving over realistic sales timescales to help you decide whether exit finance is the right approach for your Worksop scheme.

Eligibility for Development Exit Finance

Exit finance lenders assess the completed scheme rather than the development proposal. They instruct a Red Book valuation of the finished units, review your sales strategy, marketing evidence, and comparable transaction data, and advance against the current market value. For completed schemes in Worksop, having recent comparable sales evidence and, ideally, some units under offer or reserved strengthens your application.

The property must be practically complete, with Building Control sign-off, and habitable. Snagging items are acceptable, but units requiring significant further work typically need to remain on the development facility until completed. Most exit lenders require a minimum of 2-3 unsold units, though some will consider single-unit exits for higher-value properties.

Your sales strategy needs to be credible and evidenced. Lenders want to see an appointed estate agent, marketing materials, an agreed pricing strategy based on comparable evidence, and a realistic sales timeline. Overly optimistic sales projections will concern exit lenders as much as they concern development lenders. We help you present a credible sales plan that demonstrates your units will sell within the proposed exit facility term.

Live market data

Worksop
market snapshot.

HM Land Registry sold-price data for Worksop over the last twelve months, alongside the live local planning pipeline. Updated weekly.

Median price
£190,000
Sales (12m)
1,022
YoY change
Flat
Approved (recent)
215
Pipeline units
1,058
Pipeline GDV
£196.5M

Planning pipeline

Planning activity
in Worksop.

215 approved (last 12 months)
·
133 pending
·1,058 units in pipeline·£196.5M estimated GDV·75% approval rate (last 12 months)

Recently Approved

RefProposalUnitsEst. GDVStatusDate
26/00898/AGR

Prior Approval for Agricultural Fertiliser Storage Tank

Land South Of Old Trent Road Beckingham South Yorkshire

--Pending24/08/2026
26/00021/AGR

Prior Approval for Proposed Replacement Agricultural Building

Land West Of Quaker Cottage Meetinghouse Lane South Leverton Nottinghamshire

--Pending17/02/2026
25/01110/OUT

Outline Application with Some Matters Reserved (Approval Being Sought for Access…

112 North Road Retford Nottinghamshire DN22 7XN

6£582,000Pending
25/01101/FUL

Change of Use from Sui Generis (previously Class A4 & C3) to Sixteen One-Bedroom…

1 Victoria Square Worksop Nottinghamshire S80 1DX

1£97,000Pending
25/01227/LBA

Replacement of External Metal Security Shutter to the Front of the Building, Rem…

Aurora Wellbeing Centre The Old Library Memorial Avenue Worksop Nottinghamshire S80 2BJ

--Pending

Current Applications

RefProposalUnitsEst. GDVStatusDate
26/01236/AGR

Erection of Agricultural Building

Land Off Old Trent Road Beckingham South Yorkshire

--Pending21/09/2026
26/01213/FUL

Change of Use of From Dwelling to Dwelling with Dog Grooming Business run from n…

55 Wharton Street Retford Nottinghamshire DN22 7EH

1£190,000Pending16/09/2026
26/01199/LBA

Listed Building Consent for Replacement of the Existing Non-Original Ground Floo…

66 Bridge Street Worksop Nottinghamshire S80 1JA

--Pending14/09/2026
26/01184/FUL

Conversion of a Disused Farm Building into a Dwelling with Addition of a Sunroom…

Agricultural Building At Bramble Farm Everton Sluice Lane Everton South Yorkshire DN10 5AX

1£190,000Pending10/09/2026
26/01177/COU

Application for Change of use of Existing Offices to Use Class E(b) and Associat…

21 Exchange Street Retford Nottinghamshire DN22 6BL

--Pending08/09/2026

Deal intelligence

Key schemes
in Worksop.

Indicative appraisals of the largest residential schemes in the Worksop planning pipeline (all currently awaiting decision). These 3 schemes represent an estimated £90.0M in combined GDV across 451 units, with indicative capital stacks for each.

Major Residential Development Awaiting decision

Phase 3C Simpson Park Development Site Land South Of Scrooby Road And North Of Snape Lane Harworth

£43.5M

Estimated GDV

Units

218

GDV / Unit

£200k

Build Cost (Range)

£28.2M–£35.6M

Residual Land Value

Tight

GDV estimated from the HM Land Registry blended median of £190,000 plus a 5% new-build premium (assumed). At benchmark build costs and a 17.5% profit target, viability is tight - land would need to be secured well below prevailing values for this scheme to appraise. Calculate GDV

Gross Development Value£43.5M
Construction (14,824 sqm @ £2,150/sqm mid)−£31.9M
Externals, fees & contingency−£9.4M
Finance (65% LTGDV, 24m) & sales costs−£5.0M
Developer profit target (17.5% on GDV)−£7.6M
Implied residual land valueMarginal

Indicative Capital Stack

Senior Debt60% (£26.1M)Mezzanine20% (£8.7M)Developer Equity20% (£8.7M)

Broker insight: A scheme of this scale would typically attract competitive senior development finance at 60-65% LTGDV with mezzanine stretching to 85% LTGDV. Phased drawdowns reduce interest costs. Consider development exit finance to manage sales at your pace.

Get Terms for This Scheme
Appraise this dealSDLT CalculatorS106 / CILBlended Cost
Major Residential Development Awaiting decision

Land South Of Scrooby Road And North Of Snape Lane Harworth South Yorkshire

£27.5M

Estimated GDV

Units

138

GDV / Unit

£200k

Build Cost (Range)

£17.8M–£22.5M

Residual Land Value

Tight

GDV estimated from the HM Land Registry blended median of £190,000 plus a 5% new-build premium (assumed). At benchmark build costs and a 17.5% profit target, viability is tight - land would need to be secured well below prevailing values for this scheme to appraise. Calculate GDV

Gross Development Value£27.5M
Construction (9,384 sqm @ £2,150/sqm mid)−£20.2M
Externals, fees & contingency−£5.9M
Finance (65% LTGDV, 24m) & sales costs−£3.2M
Developer profit target (17.5% on GDV)−£4.8M
Implied residual land valueMarginal

Indicative Capital Stack

Senior Debt60% (£16.5M)Mezzanine20% (£5.5M)Developer Equity20% (£5.5M)

Broker insight: A scheme of this scale would typically attract competitive senior development finance at 60-65% LTGDV with mezzanine stretching to 85% LTGDV. Phased drawdowns reduce interest costs. Consider development exit finance to manage sales at your pace.

Get Terms for This Scheme
Appraise this dealSDLT CalculatorS106 / CILBlended Cost
Major Residential Development Awaiting decision

School Land And Access Kingston Road Worksop Nottinghamshire

£19.0M

Estimated GDV

Units

95

GDV / Unit

£200k

Build Cost (Range)

£12.3M–£15.5M

Residual Land Value

Tight

GDV estimated from the HM Land Registry blended median of £190,000 plus a 5% new-build premium (assumed). At benchmark build costs and a 17.5% profit target, viability is tight - land would need to be secured well below prevailing values for this scheme to appraise. Calculate GDV

Gross Development Value£19.0M
Construction (6,460 sqm @ £2,150/sqm mid)−£13.9M
Externals, fees & contingency−£4.1M
Finance (65% LTGDV, 24m) & sales costs−£2.2M
Developer profit target (17.5% on GDV)−£3.3M
Implied residual land valueMarginal

Indicative Capital Stack

Senior Debt60% (£11.4M)Mezzanine20% (£3.8M)Developer Equity20% (£3.8M)

Broker insight: A scheme of this scale would typically attract competitive senior development finance at 60-65% LTGDV with mezzanine stretching to 85% LTGDV. Phased drawdowns reduce interest costs. Consider development exit finance to manage sales at your pace.

Get Terms for This Scheme
Appraise this dealSDLT CalculatorS106 / CILBlended Cost

Appraisal assumptions

  • GDV: HM Land Registry blended median of £190,000 plus a 5% new-build premium (assumed).
  • Build cost: £1,900-£2,400/sqm (new build, indicative range informed by BCIS regional tender-price data, 2025/26) × 68 sqm/unit (NDSS-derived).
  • On-costs: externals 12.5%, professional fees 10%, contingency 5%, sales & legals 3.5000000000000004% of GDV. Excludes CIL/Section 106, which vary by charging schedule and scheme.
  • Finance: senior facility at 65% LTGDV, 8.5% pa on an average 57.49999999999999% drawdown over 24 months, plus 2.5% arrangement and exit fees.
  • Residual land value assumes the industry-standard 17.5% developer profit-on-GDV target. Indicative appraisal, not a valuation or lending offer.
Submit Your SchemeView full Worksop market dataNottinghamshire market report

Land Registry data

Recent property sales
in Worksop.

1,022 residential transactions in the last twelve months. Median sold price £190,000. 96 new-build transactions with a +25.7% premium over existing stock.

Detached

£290,000

Semi-Detached

£178,750

Terraced

£125,000

Flat

£97,000

DateAddressTypePriceTenure
31 Jul 20261A, HALL DRIVES80 3GBDetached£500,000Freehold
24 Jul 202615, CAPE HONEY WAYS81 7SRDetached£260,000Freehold
24 Jul 202645, CHURCH STREETS81 9NWSemi-Detached£140,000Freehold
21 Jul 202622, GATEKEEPER WAYS81 7SSTerraced£165,000Freehold
20 Jul 202647, ROSEDALES81 0TBDetached£347,000Freehold
20 Jul 202666, DRYDEN DALES81 0ETSemi-Detached£170,000Freehold
17 Jul 20265, MONTYS MEADOWS81 7DADetached£625,000Freehold
17 Jul 202614, GRANGE CLOSES81 9DXSemi-Detached£255,000Freehold
17 Jul 202618, SHIREOAKS ROWS81 8LPTerraced£175,000Freehold
14 Jul 20262, TENBY GROVES80 2PPSemi-Detached£130,000Freehold

Source: HM Land Registry price paid data, 12 months to September 2026 · Bassetlaw District Council planning register, retrieved September 2026. Contains HM Land Registry data © Crown copyright and database right, licensed under the Open Government Licence v3.0.

Indicative terms

Development Exit Finance rates
for Worksop deals.

Typical pricing for development exit finance in Worksop. Actual terms depend on GDV, leverage, location and your experience — the numbers below are where most structured deals land.

Interest Rate

From 0.55% p.m.

Loan to Value

Up to 75% LTV

Typical Term

6-18 months

Arrangement Fee

1-2% of facility

Indicative only, subject to individual assessment. Actual terms issued against a completed Deal Room submission.

Representative deal

Example development exit finance
structure.

Illustrative 9-Unit Scheme, Worksop

An indicative appraisal for a nine-unit residential scheme priced at Worksop's own HM Land Registry medians with the locally measured new-build premium applied. Build costs use the regional £/sqm benchmark; every figure updates with the underlying market data.

GDV

£1,689,000

Loan Amount

£1,098,000

LTV

65% LTGDV

Loan Type

Development Exit Finance

Representative only. Actual terms vary based on scheme specifics and are issued after underwriting.

Common questions

Development Exit Finance in Worksop
— answered.

What is development exit finance?
Development exit finance is a short-term loan that replaces your development finance facility once construction is complete or near-complete. It repays your development lender and provides a lower-cost holding facility while you sell the remaining units in your scheme. For completed projects in Worksop, exit finance typically costs significantly less than rolling over an expired development facility.
When should I arrange exit finance?
Ideally, start conversations with exit lenders 2-3 months before practical completion. This gives time for valuation, legal due diligence, and facility documentation so the exit facility is ready to draw as soon as your development is signed off. For Nottinghamshire projects, we coordinate the transition to ensure there's no gap between your development facility expiring and the exit facility completing.
How active is the development pipeline in Worksop?
The Bassetlaw District Council planning register currently shows 133 residential applications awaiting decision in Worksop, together proposing 334 units — the largest single scheme proposes 95 units. An active pipeline signals both developer confidence in local demand and lender familiarity with the market, which typically translates into more competitive finance terms.
How is exit finance different from extending my development loan?
Development loan extensions typically come at a premium rate (1-2% above the original facility rate) and often require additional fees. Exit finance is specifically designed for completed schemes, so it's priced against the lower risk of a finished, habitable development rather than an active construction project. The net saving - even after arrangement fees and legal costs - usually makes exit finance the more cost-effective option.
What LTV can I achieve with exit finance?
Exit finance lenders typically advance up to 70-75% of the current market value of unsold units. The valuation is based on the completed scheme rather than the development appraisal GDV, so the actual advance depends on how the market has moved since you started the project. For completed schemes in Worksop, a Red Book valuation of the finished units determines the maximum facility.
How are repayments structured on exit finance?
Most exit finance facilities allow partial repayments as individual units sell, reducing your outstanding balance and interest costs progressively. Some lenders require a minimum repayment per unit sale (typically 100-110% of the per-unit debt allocation), while others allow flexible repayment as long as the overall LTV remains within covenant. Interest can be serviced monthly or rolled up depending on the lender.
Can I use exit finance if I haven't sold any units yet?
Yes - exit finance is specifically designed for this scenario. The lender assesses the completed scheme, your sales strategy, and comparable evidence to determine that the units are saleable at the projected values. Having some units under offer or reserved strengthens your application, but it's not a requirement. For Nottinghamshire schemes, we present your sales strategy alongside local market evidence to demonstrate achievable sales timelines.
How many units need to be unsold to qualify for exit finance in Worksop?
Most development exit lenders require a minimum of 2-3 unsold units to justify the cost and complexity of a separate facility. For single remaining units of higher value, some specialist lenders will consider an exit bridge. There is no maximum limit on unsold units. Exit finance is commonly used for schemes where the majority of units remain unsold at practical completion, providing a lower-cost holding facility for the entire sales period. For Worksop schemes, the local sales market and comparable evidence determine the lender's appetite and the terms available.
Can I use exit finance if my development lender has already extended the facility?
Yes, and this is a common scenario. Many developers extend their development facility once or twice before exploring exit finance, only to discover that exit finance would have been cheaper from the outset. Even after extensions, transitioning to a dedicated exit product typically saves money because exit rates are lower and the expensive monitoring surveyor and non-utilisation charges associated with development facilities no longer apply. We regularly arrange exit finance for schemes that have already been on one or more development facility extensions.

Further reading

Development Exit Finance
guides.

12 min read

Development Exit Finance Rates, Terms and How to Arrange It

A practical guide to the pricing and terms of development exit finance, with typical rates, LTVs and fees, and the steps, documents and timeline for arranging a facility before your build loan matures.

12 min read

What Is Development Exit Finance and When Is It Used?

An explainer on development exit finance: what it is, how it differs from the build loan it replaces, and the situations in which developers use it, from slow sales and facility maturity to releasing capital for the next scheme.

9 min read

Planning Your Development Exit at Appraisal: Sell, Refinance or Hold

A planning guide to the exit decision you make when you first appraise a scheme: selling units, refinancing to hold, bulk or forward sale, and how each choice changes the leverage, term and pricing lenders offer.

View all guides

Market intelligence

Local market
reports.

5 min read

Worksop Property Market: House Prices, Sold Data & Development Finance, Q3 2026 Edition

Median price £190,000, 1,022 sales, 0% YoY. Nottinghamshire county.

6 min read

Nottinghamshire Property Market: Prices, Trends & Development Finance, Q3 2026 Edition

7 towns analysed. Median price £202,500, 13,637 transactions, -2.5% YoY.

Ready when you are

Tell us the deal.
We’ll recommend the structure.

Submit your Development Exit Finance enquiry in Worksop and a partner will come back with an initial structure and indicative terms within one working day. No forms-for-forms’-sake — a short note on the scheme is enough.

Enter the Deal RoomOr call +44 20 3816 3693

Where we fund

Worksop,
Nottinghamshire.

Adjacent products

Other services
in Worksop.

Development Finance

From 6.5% p.a. · Up to 65-70% LTGDV

Mezzanine Finance

From 12% p.a. · Up to 85-90% LTGDV

Bridging Loans

From 0.55% p.m. · Up to 75% LTV

Equity & Joint Ventures

Profit share from 40% · Up to 100% of costs

Refurbishment Finance

From 0.65% p.m. · Up to 75% LTV

Commercial Mortgages

From 5.5% p.a. · Up to 75% LTV

Nearby markets

Adjacent towns
we also fund.

Nottingham

Mansfield

Newark

West Bridgford

Arnold

Retford

Get Terms020 3816 3693