Bromley, Greater London
Mezzanine finance sits behind senior debt in the capital stack, stretching your total borrowing to 80-90% of costs. It reduces the equity you need to inject, freeing capital for additional projects.
For a typical Bromley development with a median property value of £500,000, mezzanine finance can reduce your equity requirement from approximately £700,000 to as little as £300,000 - freeing capital to pursue multiple projects simultaneously across Bromley and the surrounding area.
Mezzanine finance fills the gap between senior debt and developer equity in the capital stack. For schemes where the senior lender will fund 60-65% of costs, mezzanine can stretch total leverage to 85-90%, dramatically reducing the equity you need to inject. This capital efficiency lets you pursue multiple projects simultaneously.
The intercreditor relationship between senior and mezzanine lenders is the critical structural element. Not all senior lenders will accept mezzanine behind their facility, and those that do typically require an approved intercreditor agreement that governs priorities in a default scenario. We work with both parties to ensure the capital stack is structurally sound.
Mezzanine pricing reflects its subordinated position - typically 12-18% per annum - but the overall blended cost of your capital stack is often lower than alternative structures that achieve similar leverage. The key calculation is whether the additional leverage creates sufficient incremental return to justify the cost.
Planning in this region can be complex, with conservation areas, Green Belt restrictions, and robust local opposition adding time and cost to consenting. However, high exit values mean that lenders are often willing to offer favourable terms for well-located sites with deliverable planning. The Build-to-Rent sector is particularly active, with institutional capital increasingly targeting outer London and key South East commuter hubs.
Mezzanine finance is a powerful tool for property developers in Bromley who want to maximise their capital efficiency. By stretching total leverage from the senior lender's cap of 60-70% to 85-90% of total development costs, mezzanine dramatically reduces the equity you need to inject into each project. This freed capital can be deployed into additional schemes, effectively multiplying your development capacity across Greater London and beyond.
We coordinate the entire mezzanine process, from identifying mezzanine-friendly senior lenders through to negotiating the intercreditor agreement that governs the relationship between both tranches. This coordination is essential because the mezzanine facility must be structured in harmony with the senior debt, not bolted on as an afterthought. Our experience in structuring layered capital stacks means we can identify and resolve potential structural issues before they delay your project.
Mezzanine finance is a specialist product that sits between senior debt and developer equity in the capital stack. Structuring it correctly requires a broker who understands intercreditor dynamics, can coordinate with your senior lender, and has access to mezzanine providers who are actively deploying capital. We arrange mezzanine facilities from debt funds, family offices, and specialist lenders with genuine appetite for Greater London developments. For a typical Bromley development with a GDV around £2.0M, mezzanine could reduce your cash equity requirement from approximately £700,000 to as little as £300,000.
The mezzanine market is less transparent than senior development finance. There is no comparison website, limited published rate information, and each provider has specific criteria around minimum deal size, geographic focus, and acceptable senior lender partners. As specialist brokers, we have established relationships with mezzanine providers who can move quickly and are comfortable lending in Bromley and the wider Greater London area.
Getting the capital stack right from the outset is critical. The wrong mezzanine structure can create cash flow problems, governance friction, or exit complications that cost you more than the additional leverage is worth. Submit your project and our team will model the optimal capital structure for your development.
The live Bromley planning register currently shows 67 residential applications awaiting decision in Bromley, together proposing 901 units. The largest — at Near BR5 4BS — proposes 350 units. That pipeline is a useful gauge of both local competition and lender familiarity with Bromley schemes.
On a representative 10-unit Bromley scheme (~£5.0M GDV at the local median), mezzanine typically bridges the gap between 65% and up to 85% LTGDV — around £1.0M of additional leverage that would otherwise be developer equity.
We source several types of mezzanine capital across Greater London: traditional second-charge mezzanine that layers behind your senior development finance facility, stretched senior products where a single lender provides both tranches (eliminating intercreditor complexity), profit-share mezzanine where the provider takes a percentage of development profit instead of fixed interest, and preferred equity structures that sit between debt and true equity in the waterfall.
Each structure has different implications for your project governance, cost profile, and exit mechanics. Second-charge mezzanine typically costs 12-18% per annum but preserves your control. Profit-share structures reduce your cash costs during the build phase but can be more expensive if the scheme performs well. Stretched senior products simplify the legal structure but may carry a premium over a two-lender arrangement. We advise on the optimal approach for each Bromley development based on its specific economics.
For larger schemes, we also arrange equity and joint venture capital as an alternative to, or alongside, mezzanine debt. The right choice depends on your equity position, return expectations, and appetite for sharing control of the development process.
Mezzanine capital for Bromley schemes comes from a distinct pool of funders — specialist banks such as OakNorth, Shawbrook, and Aldermore alongside dedicated mezzanine houses. The mezzanine slice sits behind the senior facility under an intercreditor agreement, is measured against loan-to-cost (LTC) as well as LTGDV, and drawdown timing is negotiated alongside the senior lender's. Where mezzanine doesn't fit, equity finance or a second charge bridging loan can close the same gap with a different risk allocation.
Mezzanine interest rates typically range from 12% to 18% per annum, with interest usually rolled up rather than serviced monthly. Arrangement fees are 2-3% of the mezzanine facility. While these costs are higher than senior development debt, the mezzanine is funding a smaller portion of the capital stack, and the blended cost of senior plus mezzanine is often comparable to alternative structures that achieve similar leverage.
The key calculation is whether the additional leverage creates sufficient incremental return to justify the cost. If senior debt funds 65% of costs and mezzanine stretches this to 85%, you are using 20% more debt to free up 20% of equity. That freed equity can be deployed into another project, effectively doubling your development capacity. For developers in Bromley with pipeline opportunities, this capital efficiency can be transformational.
We model the full capital stack for every mezzanine enquiry, showing you the blended cost of finance, the impact on scheme profit, and the comparison with alternative structures (higher equity contribution, stretched senior, or JV equity). This analysis ensures you make an informed decision based on your project's specific numbers.
Mezzanine lenders assess your scheme through a similar lens to senior lenders but with additional focus on the developer's experience and the profit margin in the deal. Most providers require a minimum net development profit of 18-20% on cost after all finance charges, giving them comfort that the scheme can absorb cost overruns or market adjustments without threatening their position. A strong track record of delivering comparable schemes is important for securing the best mezzanine terms.
The senior lender must be mezzanine-friendly. Not all development finance lenders accept subordinated debt behind their facility, and those that do typically require an approved intercreditor agreement. We identify mezzanine-friendly senior lenders at the outset of the process, avoiding the costly scenario of agreeing senior terms only to discover the lender will not accept mezzanine.
Minimum mezzanine facility sizes are typically £200,000-£500,000, with some providers requiring larger minimum investments. For smaller schemes where mezzanine is not available, alternative approaches include stretched senior products, bridging finance for the gap, or restructuring the deal to work with a higher equity contribution.
Live market data
HM Land Registry sold-price data for Bromley over the last twelve months, alongside the live local planning pipeline. Updated weekly.
Planning pipeline
| Ref | Proposal | Units | Est. GDV | Status | Date |
|---|---|---|---|---|---|
| 25/04508/FPA | Demolition of existing garage and rear outbuilding and construction of a ground … Near BR3 3PS | 3 | £990,000 | Pending | 01/10/2026 |
| 26/03048/FPA | Change of use of First and Second Floor from commercial use (Use Class E) to pro… Near SE9 4QW | 3 | £1.5M | Pending | 28/09/2026 |
| 26/00675/FPA | Demolition of the existing youth centre building and redevelopment of the site t… Near SE9 4AS | 10 | £5.0M | Pending | 17/09/2026 |
| 26/02792/FPA | Conversion of existing flat into 2x studio flats with associated secured refuse … Near SE20 8XG | 2 | £660,000 | Pending | 08/09/2026 |
| 26/02794/FPA | Conversion of existing garage to rear garden into 1 x studio flat with associate… Near BR6 9HL | 1 | £330,000 | Pending | 07/09/2026 |
| Ref | Proposal | Units | Est. GDV | Status | Date |
|---|---|---|---|---|---|
| 26/03657/PIP | Permission in Principle for the erection of a residential development comprising… Near BR2 8FD | 9 | £4.5M | Pending | 18/09/2026 |
| 2026/1135 | Outline planning application (with all matters reserved except access and layout… Near CR0 0AJ | 46 | £23.0M | Pending | 04/09/2026 |
| 26/03460/FPA | Demolition of existing ancillary residential outbuildings, stables and associate… Near BR6 7JB | 1 | £860,000 | Pending | 02/09/2026 |
| 26/03421/FPA | Construction of replacement detached dwelling Near BR6 9DT | 1 | £860,000 | Pending | 01/09/2026 |
| 26/03422/FPA | Change of use of the existing two-storey dwellinghouse (Use Class C3) to a 5-bed… Near BR1 1HZ | 0 | - | Pending | 01/09/2026 |
Deal intelligence
Indicative appraisals of the largest residential schemes in the Bromley planning pipeline (all currently awaiting decision). These 3 schemes represent an estimated £415.5M in combined GDV across 802 units, with indicative capital stacks for each.
Applicant: Lands Improvement Holdings Ltd
£183.8M
Estimated GDV
Units
350
GDV / Unit
£525k
Build Cost (Range)
£61.9M–£79.7M
Residual Land Value
£39.7M
GDV estimated from the HM Land Registry blended median of £500,000 plus a 5% new-build premium (assumed). At benchmark build costs, the implied residual land value is £39,668,000 (£113k/unit) after a 17.5% developer profit target. Calculate GDV
| Gross Development Value | £183.8M |
| Construction (23,800 sqm @ £2,950/sqm mid) | −£70.2M |
| Externals, fees & contingency | −£20.6M |
| Finance (65% LTGDV, 24m) & sales costs | −£21.1M |
| Developer profit target (17.5% on GDV) | −£32.2M |
| Implied residual land value | £39.7M |
Broker insight: A scheme of this scale would typically attract competitive senior development finance at 60-65% LTGDV with mezzanine stretching to 85% LTGDV. Phased drawdowns reduce interest costs. Consider development exit finance to manage sales at your pace.
Applicant: hadley penge llp
£120.8M
Estimated GDV
Units
230
GDV / Unit
£525k
Build Cost (Range)
£54.9M–£70.7M
Residual Land Value
Tight
GDV estimated from the HM Land Registry blended median of £500,000 plus a 5% new-build premium (assumed). At benchmark build costs and a 17.5% profit target, viability is tight - land would need to be secured well below prevailing values for this scheme to appraise. Calculate GDV
| Gross Development Value | £120.8M |
| Construction (15,640 sqm @ £3,980/sqm mid) | −£62.2M |
| Externals, fees & contingency | −£18.3M |
| Finance (65% LTGDV, 24m) & sales costs | −£13.9M |
| Developer profit target (17.5% on GDV) | −£21.1M |
| Implied residual land value | Marginal |
Broker insight: A scheme of this scale would typically attract competitive senior development finance at 60-65% LTGDV with mezzanine stretching to 85% LTGDV. Phased drawdowns reduce interest costs. Consider development exit finance to manage sales at your pace.
£111M
Estimated GDV
Units
222
GDV / Unit
£500k
Build Cost (Range)
£24.3M–£31.4M
Residual Land Value
£42.9M
GDV estimated from the HM Land Registry blended median of £500,000. At benchmark build costs, the implied residual land value is £42,937,000 (£193k/unit) after a 17.5% developer profit target. Calculate GDV
| Gross Development Value | £111M |
| Construction (15,096 sqm @ £1,830/sqm mid) | −£27.6M |
| Externals, fees & contingency | −£8.3M |
| Finance (65% LTGDV, 24m) & sales costs | −£12.7M |
| Developer profit target (17.5% on GDV) | −£19.4M |
| Implied residual land value | £42.9M |
Broker insight: A scheme of this scale would typically attract competitive senior development finance at 60-65% LTGDV with mezzanine stretching to 85% LTGDV. Phased drawdowns reduce interest costs. Consider development exit finance to manage sales at your pace.
Appraisal assumptions
Land Registry data
4,648 residential transactions in the last twelve months. Median sold price £500,000 (+1% YoY). 44 new-build transactions with a -31.7% premium over existing stock.
Detached
£860,000
Semi-Detached
£620,000
Terraced
£500,000
Flat
£330,000
| Date | Address | Type | Price | Tenure |
|---|---|---|---|---|
| 26 Aug 2026 | 76, FARINGDON AVENUEBR2 8BU | Terraced | £480,000 | Freehold |
| 25 Aug 2026 | 105, CROFTON ROADBR6 8HU | Semi-Detached | £865,000 | Freehold |
| 24 Aug 2026 | FLAT 6, LINDUMS, 26, BRACKLEY ROADBR3 1RQ | Flat | £424,000 | Leasehold |
| 24 Aug 2026 | FLAT 7, LONGACRE COURT, 8, NEWTON PARK PLACEBR7 5BF | Flat | £740,000 | Leasehold |
| 24 Aug 2026 | 20, MOORFIELD ROADBR6 0HQ | Semi-Detached | £515,000 | Freehold |
| 21 Aug 2026 | 21, MELROSE CRESCENTBR6 9NT | Semi-Detached | £525,000 | Freehold |
| 21 Aug 2026 | 114, AVONDALE ROADBR1 4HA | Semi-Detached | £760,000 | Freehold |
| 21 Aug 2026 | 53, SPUR ROADBR6 0QR | Semi-Detached | £700,000 | Freehold |
| 20 Aug 2026 | 11, OLEANDER CLOSEBR6 7TQ | Detached | £630,000 | Freehold |
| 20 Aug 2026 | 151, CLAREVILLE ROADBR5 1RS | Terraced | £525,000 | Freehold |
Source: HM Land Registry price paid data, 12 months to October 2026 · Bromley planning register, retrieved October 2026. Contains HM Land Registry data © Crown copyright and database right, licensed under the Open Government Licence v3.0.
Indicative terms
Typical pricing for mezzanine finance in Bromley. Actual terms depend on GDV, leverage, location and your experience — the numbers below are where most structured deals land.
Interest Rate
From 12% p.a.
Loan to Value
Up to 85-90% LTGDV
Typical Term
12-24 months
Arrangement Fee
2-3% of facility
Indicative only, subject to individual assessment. Actual terms issued against a completed Deal Room submission.
Representative deal
An indicative appraisal for a nine-unit residential scheme priced at Bromley's own HM Land Registry medians with the locally measured new-build premium applied. Build costs use the regional £/sqm benchmark; every figure updates with the underlying market data.
GDV
£5,859,000
Loan Amount
£3,808,000
LTV
65% LTGDV
Loan Type
Mezzanine Finance
Representative only. Actual terms vary based on scheme specifics and are issued after underwriting.
Common questions
Further reading
A comprehensive guide to understanding and structuring the capital stack in UK property development, from senior debt through mezzanine to equity contributions.
Senior debt and mezzanine finance are different layers of the same capital stack. Understanding how they interact is essential for structuring any development deal.
A worked cost comparison of mezzanine finance and joint venture equity on the same development, showing what each costs when the scheme performs, when profit falls short and where the break-even sits.
Market intelligence
Median price £500,000, 4,648 sales, +1% YoY. Greater London county.
51 towns analysed. Median price £480,000, 57,112 transactions, +0.2% YoY.
Indicative funding summary
Enter a GDV and costs to see two indicative capital stacks: senior debt only, and stretched senior or mezzanine. Indicative only, not an offer of finance.
Indicative funding summary
Enter a GDV and costs to see two indicative capital stacks.
Indicative only, not an offer of finance. Lenders size facilities on a RICS valuation, the cost plan and your experience.
Indicative structures
Recently consented schemes in Greater London, modelled at 70% LTGDV with GDV estimated from local Land Registry sold prices. Indicative only: not offers of finance and not completed transactions.
Office to residential
Change of use of ground and first-floor offices to seven flats.
Upward extension (prior approval)
Two additional storeys on an existing building, creating twelve flats.
Office to residential
Change of use of an office building to six flats, with a rear extension.
Ready when you are
Submit your Mezzanine Finance enquiry in Bromley and a partner will come back with an initial structure and indicative terms within one working day. No forms-for-forms’-sake — a short note on the scheme is enough.
Where we fund
Adjacent products
From 6.5% p.a. · Up to 65-70% LTGDV
From 0.55% p.m. · Up to 75% LTV
Profit share from 40% · Up to 100% of costs
From 0.65% p.m. · Up to 75% LTV
From 5.5% p.a. · Up to 75% LTV
From 0.55% p.m. · Up to 75% LTV